The bathroom before remodeling
This is a remodel of an original 1950's era bathroom that we performed in North Bellmore.The walls,ceiling and floor are plaster and cement. It was a difficult demolition but the work area was isolated and the house was kept clean.
Bathroom Gutted
The room is gutted and ready for framing, plumbing and electrical work. You can see from the pictures, the team at Topnotch has their work cut out for them!
Radiant floor heat installed, ready for tile
Cement board in the wet areas with moisture resistant sheetrock on the remainder of the bathroom. Bathrooms must be insulated well and this one features spray foam on the cathedral ceiling.The radiant floor heat is a separate zone with its own thermostat to maintain a warm floor and cozy temperatures through the winter.
Bathroom remodeling completed
Completed bathroom! Wow! Tile by Cancos, plumbing fixtures are Kohler from Blackman